Case Studies
-
New Ground Source Heating in East Sussex
We were contacted by our customer to aid them with increasing the EPC for the property due to the age of the existing boiler.
Read the full case study -
18 New Build Homes in Godstone
Riverdale Developments
We were contracted to install 1st fix plumbing, soil and waste, underfloor heating, boilers and unvented hot water systems, communal water & gas and rainwater guttering.
Read the full case study -
Bespoke Development of 3 New Build Homes in Sevenoaks
Rise Construction
GME Group worked to carry out a tender for bespoke development to include 1st fix plumbing, soil & waste, air-source heat pumps and underfloor heating.
Read the full case study -
21 New Build Houses in Lenham
Akehurst Homes
We were contracted to install 1st fix plumbing, soil and waste, radiators, boilers and unvented hot water systems, communal water & gas and rainwater guttering.
Read the full case study -
25 New Build Homes in Lewes
Natterjack Construction
We were first contacted by Natterjack construction early in 2018 and invited to tender for the mechanical works at styles field site in Lewes that was due to commence in March 2018.
Read the full case study -
Office Conversion & Extension into 42 Apartments in East Grinstead
Whitehall Homes
42 Apartments – Office conversion and extension.
This contract is ongoing, and updates will be provided.
Read the full case study -
Electrical Installation for 24 Holiday Lodges in Stone Cross
Osborne Leisure
Working alongside Osborn leisure on previous projects and were given electrical drawings for a holiday lodge development in Stone Cross.
Read the full case study -
Electrical Services for New Build Industrial Unit
Commercial Client
GME Group Electrical division provided full specification and design for power and lighting. Completed the full installation on time and budget.
Read the full case study -
Upgrade of Commercial Natural Gas Boiler
Private Client
Reposition and upgrade 100kw natural gas boiler, new commercial gas pipe run and upgrade to heating controls.
Read the full case study -
Plant Room Upgrade at Prestigious Estate in East Sussex
Private Client
GME Group were tasked with the upgrade of the main plant room in a prestigious estate in East Sussex.
Read the full case study -
Commercial Pipework for 25 Properties in Lewes
GME Group Commercial division were asked to provide a tender to provide soil pipework, mains cold water supplies and commercial gas pipework from a communal meter room to 25 individual properties.
Read the full case study -
Commercial Plant Room in Brighton
Flude Commercial
GME Group were called by Flude commercial to carry out a tender price for the design and installation for a commercial plant room serving an office block in the centre of Brighton.
Read the full case study -
Commercial Gas Purging & Decommision in Crowborough
Whitehall Homes
A Commercial Project Recently Carried out for a new build site with over 30 homes in Crowborough, East Sussex.
Read the full case study